Expert Zone

October 17, 2018

Water/Wastewater Highlights Coming to Automation Fair

REGISTER ONLINE AT WWW.ROCKWELLAUTOMATION.COM This November, Rockwell Automation is bringing their Automation Fair event to Philadelphia. This 2-day event brings together the top industry experts from […]
October 11, 2018

5 New Industrial Controls Not to Miss at Automation Fair

Industrial controls help our machines and processes be more productive from design and install through maintenance and operation. These components support and enable the entire manufacturing […]
October 5, 2018

Connecting to Serial Ports & Legacy Devices

As technology evolves, so do the physical connections to hardware. Newer computers and laptops no longer support the standard 9-pin serial connection port that was used […]
October 1, 2018

Haste Makes Waste: How a Light Study Can Save You From Overbuying

Now is an ideal time to upgrade to LED lighting. Many utility companies are offering rebates for energy efficient upgrades and the price per lamp has come […]
September 26, 2018

Decrease Downtime with Automatic Device Configuration

We’ve all been there – a drive fails, and production suddenly comes to a stop. Every minute the line is down can costs thousands. Did you know that […]
September 18, 2018

Survey Says: How Can I Get Product Notices & Safety Advisories?

One of the hot topics on this year’s Rockwell customer survey results was the desire for Product Notices and Product Safety Advisories. Your feedback to us […]
September 12, 2018

Scalable options for Craft Brewhouses

Love to brew beer? Or love to drink it and know some local craft breweries you could help?  Are they, or you, in the 5 to […]
September 10, 2018

What you Need to Know – Converting MicroLogix to Micro800

Migrating a MicroLogix MicroLogix controllers have been around since the mid-1990s and are still one of the most used micro PLCs around the world. However, as […]
September 6, 2018

Modernization & the Value of an Automation Assessment

Do you: Know which components on your floor are no longer supported? Have a 2 or 3 year capital improvement or modernization plan? Have confidence that […]